Customer
FCK/ExímiaProject
Roadway interventions throughout Miguel Sutil Ave, consisting of the following Trenches (partially covered lowered roads): Trabalhadores (918 m); Santa Rosa (530 m); Mario Andreazza (230 m) Tijucal (525 m); and Verdão, (440 m ), totaling approximately 2.6 km in length and 31,000 m2 of retaining structures.Overpasses on Av. Miguel Sutil, with a total length of 90 m, including retaining structures.